Prepare for a contractor meeting with scope, access, decisions and follow-up documented.
Before relying on this checklist These checklists are generic organizing aids, not authoritative procedures. Add the permits, codes, accessibility requirements, workplace rules, contracts, manufacturer instructions, qualified trades, privacy/security controls and professional approvals that apply to the actual project. Safety-critical work should use the applicable approved procedure, not a generic checklist.
Checklist progress: 0 of 16
Before the meeting
Scope and assumptions
Cost and schedule
After the meeting
Make it project-specific
Add actual names, dates, model numbers, approvals, contract requirements and local rules. A generic checklist is an organizing layer, not an authoritative operating procedure.